Steel is usually the costliest single material in the grey structure of a house. On a 5 Marla, 10 Marla or 1 Kanal house in Lahore, a proper bar bending schedule (BBS) tells your contractor exactly how many bars to cut, at what length and in what shape, so you pay for the steel your structure needs and not for the scrap pile.
What a House BBS Covers
A house BBS is prepared member by member from the approved structural drawings. For a typical double-storey house it covers:
- Footings or raft foundation, including dowel bars for columns
- Plinth beams and ground beams
- Columns and shear walls, floor by floor
- Roof beams, lintels and chajjas
- Roof slabs, including extra top bars over supports
- Staircase waist slab, landings and steps
- Boundary wall and retaining wall footings where needed
BBS by Plot Size
| Plot size | Typical structure | What matters most in the BBS |
|---|---|---|
| 5 Marla | Double storey, small spans, many columns close together | Column and beam steel, lap positions, slab steel around the stair opening |
| 10 Marla | Double storey, often with a basement or large lounge spans | Longer beams, extra top steel over supports, basement wall steel if any |
| 1 Kanal | Double storey with basement, larger cantilevers and spans | Raft or combined footings, deep beams, cantilever top steel, retaining walls |
Steel quantity depends on the structural design, the soil and the number of storeys, so a reliable figure only comes from the BBS itself. Per-square-foot thumb rules are fine for an early budget, but they can be wrong by a large margin on a real house.
How the BBS Saves Money on a House
- Less cutting waste. Bars are cut from standard 40 ft lengths in combinations that leave the least scrap.
- Correct ordering. You order each diameter in the right quantity instead of buying extra to be safe.
- Site checking. Your engineer can check bars against the schedule before concrete is poured.
- Fair billing. Steel in the contractor bill can be checked against the BBS weight.
What You Need to Send
Send the structural drawings (foundation plan, column layout, beam and slab details) as PDF or AutoCAD. If you only have architectural drawings, we can prepare the structural design first and the BBS after it.
Get Your House BBS From Design Estimations Engineering Services
Design Estimations Engineering Services in Gulberg III, Lahore prepares BBS for houses of every plot size, along with BOQ and rebar shop drawings. See our bar bending schedule (BBS) service or send your drawings on WhatsApp at +92 328 9900555.
Frequently Asked Questions
How long does a BBS take for a 10 Marla house?
For a standard double-storey 10 Marla house with complete structural drawings, a BBS usually takes a few working days. Larger houses with basements take longer.
Can you make a BBS from another engineer’s drawings?
Yes. We prepare the BBS from any approved structural drawings. If something is missing or unclear in the drawings, we list it and confirm it before finalising.
Do I need a BBS for a small 5 Marla house?
Yes. Even on a small house, steel is a large share of the grey structure cost, and a BBS is the simplest way to control cutting waste and check the contractor.