In DHA and Bahria Town Lahore, you cannot start construction until the society approves your house drawings. A plan that does not follow the society’s rules gets sent back, and every round of corrections delays your project. Getting the drawings right the first time saves weeks.
Design Estimations Engineering Services designs houses in both societies. This guide explains what the societies check, what you usually need, and how to avoid the most common delays.
Why approval matters
Both societies have their own building rules to keep streets, light and safety consistent. Building without approval, or building differently from the approved plan, can lead to fines, stopped work, or problems later when you want a completion certificate or want to sell the house.
What the society checks in your drawings
Every society has its own by-laws, and they are different for each plot size and plot category. In general, the society checks:
- Covered area: how much of the plot the house covers on each floor.
- Setbacks: the open space left at the front, back and sometimes the sides.
- Height and number of floors: including what is allowed on the roof.
- Basement: whether one is allowed on your plot, and its limits.
- Front elevation and boundary wall: height and design limits.
- Parking, drainage and safety: such as the car porch, rainwater flow and stair design.
DHA and Bahria Town do not have the same rules, and the rules can change over time. A plan made for one society should never be assumed to pass in the other.
Documents you usually need
The exact list is set by the society and can change, so always confirm the current requirements with its building control or town planning office. Usually, you will need:
- Proof of ownership and the plot’s allotment and possession documents.
- The plot’s site plan or demarcation details from the society.
- Architectural drawings: floor plans, elevations and sections, prepared and signed by a registered architect.
- Structural drawings, prepared and signed by a registered structural engineer.
- The society’s application forms and fee payment.
Five common reasons for delays
- Covered area over the limit, often because a balcony or roof room was counted wrongly.
- Setbacks not shown clearly on the drawings.
- Drawings and structure do not match, for example a column in the plan that is missing in the structural drawings.
- Missing signatures or registration details of the architect or engineer.
- A design copied from another society where the rules are different.
How we help
We plan your house around the rules for your exact plot from the very first sketch, so the design you approve in 3D is the design the society approves. Because our architectural design and structural design teams work together, the drawings match. You can see our area pages for DHA Lahore and Bahria Town Lahore for more on how we work there.
If you already have drawings from another architect that were rejected or need changes, we can redesign them to meet the society’s requirements.