Building a house is easier when you know what comes next. Here are the main stages of house construction in Lahore, and what to check at each one.
1. Planning and Budget
Decide your requirements, number of rooms and budget. Use our cost guides for 5 Marla, 10 Marla and 1 Kanal houses to set a realistic figure.
2. Design and 3D Views
Your architect prepares the layout and elevation. Approve the design in 3D before moving on.
3. Structural Design and Drawings
An engineer prepares the structural design, and the architect prepares the full set of 2D working drawings.
4. Map Approval
Submit drawings to your society or authority. Read our guide on approval in DHA and Bahria Town.
5. Estimate, BOQ and Contractor Selection
Prepare a BOQ, get quotes from several contractors on the same BOQ, and agree a written contract with payment stages.
6. Excavation and Foundation
Mark the layout, excavate, apply termite proofing and build foundations. Check: foundation sizes and steel against drawings before concrete.
7. Grey Structure
Columns, beams, slabs, walls, plaster, and plumbing and electrical conduits. Check: steel against the BBS, concrete curing, and wall alignment.
8. Finishing
Flooring, paint, doors, windows, kitchen, washrooms, wiring and lights. Check: materials match the agreed specification and samples.
9. Final Checks and Handover
Test plumbing for leaks, electrical points, doors and windows. Make a list of defects and get them fixed before final payment.
Keep Control at Every Stage
Measure work before each payment and keep records. Contractor bill checking and project management help you avoid overpaying and delays.
Plan Your Construction With Us
Design Estimations Engineering Services supports you from design to completion: 3D views, structural design, estimates and project management. Call or WhatsApp +92 328 9900555 for a free consultation.